logo


The 2006 Building Assessment Report prepared by ttl-architects in conjunction with Al Hodson of Resurgence Engineering identified a number of problems that required immediate intervention. In particular, extensive water damage had created both internal and external decay that without swift action would render Liberty Hall beyond the point of repair.

Phase One of the restoration plan was devised to address the urgent repairs needed to stabilize and protect the building.


Continue to Restoration: Phase Two »